<div dir="ltr"><div>Is there any guidance on when commits should make it to autoland and inbound for both Merge Days (14th and 21st)? I suppose people should just get things in 24 hours before midnight 00:00 Pacific Time to be "safe" in case there's any bustages (hopefully reduced with the soft freeze).<br></div><div><br></div><div>For some context from 56 Merge Day (August 2nd), the last autoland commit that made it to Beta 56 was from August 1st 06:49 Pacific, and the last inbound commit was from 14:12. mozilla-central was tagged at August 2nd 00:35. In this case, autoland had an ~18 hour earlier cutoff and inbound had a ~10 hour earlier cutoff to "make it" without needing approval-beta-56. There were 176 bugs that landed on autoland [1] or inbound [2] while it was still "August 2nd Pacific", and 44 (25%) of those were uplifted. (I suppose not auto-uplifting the other 75% might be worth the overhead of additionally requesting+approving 10% of the 445 bugs uplifted to 56.)<br></div><div><br></div><div>Ed Lee</div><div><br></div><div>[1] <a href="https://hg.mozilla.org/integration/autoland/pushloghtml?startdate=2017-08-01+13%3A50&enddate=2017-08-03+07">https://hg.mozilla.org/integration/autoland/pushloghtml?startdate=2017-08-01+13%3A50&enddate=2017-08-03+07</a><br>[2] <a href="https://hg.mozilla.org/integration/mozilla-inbound/pushloghtml?startdate=2017-08-01+21%3A13&enddate=2017-08-03+07">https://hg.mozilla.org/integration/mozilla-inbound/pushloghtml?startdate=2017-08-01+21%3A13&enddate=2017-08-03+07</a><br></div></div><div class="gmail_extra"><br><div class="gmail_quote">On Thu, Sep 7, 2017 at 6:07 AM, Sylvestre Ledru <span dir="ltr"><<a href="mailto:s@mozilla.com" target="_blank">s@mozilla.com</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">Hello,<br>
<br>
tldr: we are going to do a first merge of m-c => m-b and use the<br>
devedition population one week earlier to push 57.0b1 & 57.0b2.<br>
<br>
In order to maximize beta testing, we are going to take advantage of the<br>
fact that we have a different set of users with the developer edition<br>
(which is, since the completion of the dawn project, based on mozilla-beta).<br>
September 14th, we will merge mozilla-central => mozilla-beta and<br>
mozilla-beta => mozilla-release. September 19th, we will push to the<br>
devedition population the first beta of 57. Later, we will be pushing a<br>
second beta to this channel.<br>
In parallel, to minimize the impact on the developer, mozilla-central<br>
will remain 57.0a1 and will be merged to mozilla-beta transparently.<br>
Nightly will become 58.0a1 on September 21th.<br>
The regular beta population will remain on 56 and will be provided<br>
updates to the RC builds.<br>
<br>
The milestones are detailed in this Google doc:<br>
<a href="https://docs.google.com/document/d/1jeypuqBqEyIh-4qxXT0UnE2aVjetN7uVD8W7L7TbWKg/edit" rel="noreferrer" target="_blank">https://docs.google.com/<wbr>document/d/1jeypuqBqEyIh-<wbr>4qxXT0UnE2aVjetN7uVD8W7L7TbWKg<wbr>/edit</a><br>
<br>
In parallel, as the soft freeze demonstrated its value during previous<br>
cycles, we are going to use this again during the 57 nightly cycle. From<br>
September 18th, we will ask you to land only bug fixes, stability or<br>
important performance fixes. New development not planned for 57 should<br>
land once mozilla-central will become 58 (September 21th).<br>
<br>
Thanks,<br>
Sylvestre<br>
<br>
</blockquote></div><br><br clear="all"><br>-- <br><div class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr">Ed Lee<br></div></div>
</div>